Self-Texture Synthetic Running Track

Home > Application > Self-Texture Synthetic Running Track

Self-Texture Synthetic Running Track

Material Introduction

SHTSports Environmental Protection Non-toxic new self-texture plastic track is designed based on sports biomechanics with a unique obturator microbubble elastic interlayer , which fully meets the impact absorption rate requirement of 35%-50% latest issued by IAAF. Its professional structure of cast-in-place modelling is original creation in China.

Material characteristics: This running track is designed according to biomechanics, which can avoid the sports injuries by reducing the impact for human joints when landing on the ground and increase the sports pleasure by enabling the human body to obtain continuous driving force.

Since the grain type plastic runway characteristics
  • Super Wear Resistance

    Weather resistance, the unique anti-UV and anti-aging additives guarantee excellent performance of anti-aging and anti-UV color changing for the product, the color is bright and long-lasting.

  • Outstanding athletic performance

    Wear-resistant and anti-slip, instead of EPDM granules, it adopts more wear-resistant polyurethane formula as anti-slip surface, special additives and diamond powder are added to the formulate which are sprayed into a concave layer making the surface more wear-resistant and anti-slip. The concave surface retains weather resistance and aging resistance of traditional polyurethane track without threshing.

  • Strong adhesion performance

    Excellent construction performance: simple construction with special mechanical spraying, greatly shorten the construction time.

  • EPDM granules

    The engineering cost is cheaper without EPDM granules.

  • Environmentally

    Environmentally friendly material and stable quality.

  • Patent anti-aging

    Suitable for both cement foundation and asphalt foundation.

Application:

International competition running track, national competition venue, professional sports school training and teaching venue, general school teaching venue, playground, professional gymnasium, multi-purpose stadium.

Layer structures
  • Runway
  • stadium
  • lawn
Synthetic running track Process
  • Foundation treatment
  • Laying bottom glue
  • Laying slurry layer
  • Laying flowers plasma layer
  • Spraying line site rules
  • Completion
Construction Introduce

Self-texture running track surface(thickness 13mm), material consumption per square meter:

NO. Material name Dosage(kg/㎡) Remarks
1 Waterproof binder 0.30 Cement foundation
2 Track bottom material(1:4 red) 11.5  
3 Self-textured surface paint(1:2) 1.20 Add EPDM powder and quartz sand
4 Quartz sand 0.10  
5 EPDM powder 0.80  
6 Environmentally friendly diluent 0.50 Total amount of primer and surface paint 3-5%
7 Drier 0.06 Bottom Material 0.3%.Surface paint 1-2%
8 Line paint 0.01  
Maintenance:

1. The breathable track can be walked on in 7-10 days after it is completed.

2. The plastic track is suitable for all-weather use under certain drainage facilities. Plastic track is used for athlete training, competitions, student sports and fitness exercises, and is not suitable for other purposes.

3,Please keep the running track clean to avoid the pollution of harmful substances, avoid severe mechanical shock and friction; No vehicle is allowed on the track, heavy loads and sharp objects(except standard running shoes) are forbidden. Athletes must wear special sports shoes, the nail length of sports shoes is generally no more than 7 mm, and that of jumping shoes are generally no more than 11 mm. If the shoes have longer nails, they are not allowed on the track.

4. Avoid long-term heavy loads on the track;

5, Avoid fireworks and pyrogens, and keep organic solvents, chemicals, cigarette butts, other fires and pollutants away from the track.

6,Should be washed with water spray from time to time, Oil stains can be washed out with 10% ammonia or detergent.

7. The edge of the plastic track should be protected and should not be arbitrarily moved. If the tooth is damaged or foamed, the construction unit should be notified in time for repair.

LINKS:

Artificial Grass | Running Track